GIFT IFSC automation desk
Company in. Hub out. Route decided while you type.
Five hundred listed treasuries, fifty-two corridors, one determination. Net worth and the 400% ceiling load automatically; both ends of the corridor carry their flag, their currency and a live exchange rate.
Source — GIFT City, Gujarat
GIFT IFSC, Gandhinagar
INR · Indian Rupee
₹ 12,40,00,00,000
₹ 1,240 crore leaving India
Fetching rate
1 INR = 0.0153 SGD
1 SGD = ₹65.36
ODI / OPI corridor
Target hub
Singapore, Singapore
SGD · Singapore Dollar
SGD 189,720,000
Settles in SGD at the rate shown
Net worth (audited)
₹ 5,66,235 Cr
Rule 7 ceiling — 400%
₹ 22,64,940 Cr
Already committed
₹ 5,90,994 Cr
Headroom after this remittance
₹ 16,72,706 Cr
Within the 400% ceiling — the automatic route applies under Rule 7, no prior approval needed.
In plain words: a company may commit up to four times its own net worth abroad without asking the RBI first. Pick the company, pick the hub, type the rupee amount — the desk shows what lands at the other end in that hub's currency and whether the file goes the automatic or the approval way.
Forecast first — GIFT desk
Singapore · SGD · ₹475 cr · ODI · tape reconnecting
All-in cost
The investment corridor models 16.53 bps in bank costs; income withholding is assessed separately.
Recommended action
Put the ticket to a second AD bank and quote 8 bps.
A ₹475 crore ticket at 14 bps carries ₹6.7 lakh of spread — the rail's observed floor for this corridor is materially tighter.
All-in drops to roughly 10.53 bps on the same statutory route.
Also forecast on this desk
The unhedged window on this ticket risks about ₹1.8 crore at 95% confidence.
watchp50 0.74 ₹ cr · p90 1.8 ₹ cr — Book a same-day forward on SGD for the full ticket before release.
Live FX and market clock
INR spot board · top 25
European Central Bank reference fixings via frankfurter.dev, polled every 60 seconds.
Syncing
GIFT IFSC
--:--
Singapore
--:--
Dubai
--:--
London
--:--
New York
--:--
| Currency | Region | 1 INR → | 1 unit → INR | Δ vs prev tick | Converted |
|---|---|---|---|---|---|
| USD US Dollar | AMER | — | — | — | — |
| EUR Euro | EMEA | — | — | — | — |
| GBP Pound Sterling | EMEA | — | — | — | — |
| JPY Japanese Yen | APAC | — | — | — | — |
| CHF Swiss Franc | EMEA | — | — | — | — |
| SGD Singapore Dollar | APAC | — | — | — | — |
| HKD Hong Kong Dollar | APAC | — | — | — | — |
| CNY Chinese Yuan | APAC | — | — | — | — |
| AUD Australian Dollar | APAC | — | — | — | — |
| CAD Canadian Dollar | AMER | — | — | — | — |
| NZD NZ Dollar | APAC | — | — | — | — |
| SEK Swedish Krona | EMEA | — | — | — | — |
| NOK Norwegian Krone | EMEA | — | — | — | — |
| DKK Danish Krone | EMEA | — | — | — | — |
| KRW Korean Won | APAC | — | — | — | — |
| THB Thai Baht | APAC | — | — | — | — |
| MYR Malaysian Ringgit | APAC | — | — | — | — |
| IDR Indonesian Rupiah | APAC | — | — | — | — |
| PHP Philippine Peso | APAC | — | — | — | — |
| ZAR South African Rand | AFR | — | — | — | — |
| BRL Brazilian Real | AMER | — | — | — | — |
| MXN Mexican Peso | AMER | — | — | — | — |
| TRY Turkish Lira | EMEA | — | — | — | — |
| PLN Polish Zloty | EMEA | — | — | — | — |
| ILS Israeli Shekel | MENA | — | — | — | — |
In plain words — one rupee amount, priced at the same moment in 25 currencies, so a treasury can see exactly what lands at each hub before it commits.
Documents
9 pages · 16:9
Goa Buildathon 2027 Pitch Deck
Problem, unified pre-validation rail, four key innovations, users and pilot targets, target stack beside prototype status, three-phase roadmap, evaluation-criteria mapping and team.
Download3 pages · 16:9
Pitch Deck — Synopsis & Architecture
Merges the synopsis and the 2-page architecture: abstract, three-member team, decision stack, trust boundaries and five-stage flow.
Download1 page · A3
Synopsis with Infographics
200-word abstract, connected workflow infographic, coverage boundaries, the three-member team and copyright notice.
Download2 pages · 16:9
System Architecture & Functionality
Decision stack, identity boundaries, secure records, five-stage flow and production integration gates.
Download22 pages · 16:9
Venture Capital Pitch Deck
Connected Console, 3D clearance, regulator/GIFT/fund portals, AI, global markets, security, evidence and pilot economics.
DownloadIn plain words — revised 31 October 2026: a one-page synopsis, two-page architecture and 22-page investor pitch. Earlier 6-, 17- and 24-page dossiers remain available in the presentation library as dated archives.
Continue on the rail
GIFT IFSC desk — 3D process simulation
The onshore-offshore leg as the IFSCA-supervised unit processes it.
Live USD/INR
₹86.9565 ▬
Tape status
Syncing
Print sequence
#0
Paper today → rail
24 days → 9 min
Who acts
IFSC unit
What happens at this stage
Transaction opens inside the GIFT unit with IFSCA reading live.
Elapsed 24s of 244s on the rail · stage cost 24s
Qwen · reasoning
Statutory reasoning model reads the rule and the filing together, and writes the conclusion with the rule quoted.
LangChain · orchestration
Chains the retrieval, tool calls and checks in a fixed order so every filing is examined the same way.
Alibaba Cloud · compute
Runs the heavy document and screening workloads in an India-resident region.
Federated ledger
Each result is hash-chained into a block every regulator node holds a copy of.
Human desk
A named officer signs this off. The machine only prepares the file.