Market closed · Connecting · --:--:-- UTC

USD/INR0.00%EUR/INR0.00%GBP/INR0.00%JPY/INR0.00%AUD/INR0.00%SGD/INR0.00%CHF/INR0.00%HKD/INR0.00%

Mechanism Matrix — seven layers, one record

Architecture of the outbound rail

Every layer states what enters, what it decides, and what it can never do.

The rail is not one model answering one question. It is seven layers, each with a single responsibility, a named owner, a declared technology and a failure position. A layer may only pass forward what the layer before it sealed.

7

Sequenced layers

Each one seals its output before the next may read it.

9 min

End-to-end clearance

Against 28 days across five parties working in sequence.

1

Model in the path

Statutory drafting only. Rule code holds every veto.

100%

Checkpoints proved

Every layer commits a hash-chained, verifiable artefact.

Layer by layer

Open a layer to see its contract.

Input, action, output, technology, owner, and the position it takes when something is unclear. Nothing in the rail operates without all six being stated.

Enters the layer

Sealed entity header, existing overseas commitments, guarantees and prior ODI/OPI drawdowns.

What the layer does

Applies the 400% of net worth financial-commitment ceiling at group level, subtracts utilised headroom, and returns remaining capacity to the rupee.

Leaves the layer

Headroom instrument — ceiling, utilised, remaining, and the route the number implies.

Technology chosen

Deterministic rules engine (no model in the decision path)

A ceiling is arithmetic under law, not judgement. Hard-coded rule logic is reproducible, testable and defensible to a supervisor line by line.

Ownership

Raja Mukherjee — Team Lead

Accountable for the design of this layer and the defensibility of its output.

Failure position

Any ambiguity resolves conservatively — downward — and flags for human review.

1.2 sec automated · 3–6 days manual

In plain words

Indian law lets a company commit abroad up to four times what it is worth. This layer does that sum and shows how much room is left.

Cross-layer control matrix

Where judgement is allowed, and where it is forbidden.

Cross-layer control matrix, scrollable horizontally

Layer

Determinism

Model involvement

Regulator visibility

Cryptographic proof

01 · Intake & Identity

02 · Rule 7 Headroom Engine

03 · Statutory Reasoning

04 · Route Determination

05 · Evidence & Zero-Knowledge Proof

06 · Federated Supervisory Ledger

07 · Clearance & Continuing Compliance

Full Partial None

Read the second column downward: the model appears once. Every layer that decides a ceiling, a route or a prohibition is fully deterministic. That single property is what makes the rail presentable to a supervisor.

Time ledger

Automated rail

9 min

Seven layers running in sequence, each sealing a proved artefact, with all six authorities and the AD bank reading the same record as it forms.

Manual practice

28 days

The same file rebuilt five times by counsel, the treasury, the AD desk and two regulators — sequentially, each waiting on the last.